Abdullatif, M I (1992) A system for quality-related costs for construction projects, Unpublished PhD Thesis, , University of Kansas.

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction, Unpublished PhD Thesis, , University of Kansas.

Chui, K W (2010) Comparison of construction labor productivity between U.S. and China: Using on-site productivity measurement methods, Unpublished PhD Thesis, , University of Kansas.

Eilers, H I (2015) Impact of sustainable business practices on strategic performance for commercial building contractors, Unpublished PhD Thesis, , University of Kansas.

Guthrie, J L (2000) Group-level reengineering process, Unpublished PhD Thesis, , University of Kansas.

Hunt, B J P (1980) Development of a research program for scaffolding standards, Unpublished PhD Thesis, , University of Kansas.

Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations, Unpublished PhD Thesis, , University of Kansas.

  • Type: Thesis
  • Keywords: coordination; measurement; measurement method; construction site; highway; benchmarking; bridge construction; communication; infrastructure construction; productivity; project manager; experiment
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304616942
  • Abstract:
    Existing on-site construction productivity measurement methods have some common limitations, such as the inability to provide data to engineers and project managers for real-time analyses and the difficulties of sharing data among participants involved in construction operations. To address these shortfalls, a wireless real-t ime productivity m easurement (WRITE) system was developed. To validate the system, field experiments were conducted at highway and bridge construction sites. Statistical methods, such as the hypothesis test, the normality test, the paired t-test, and the Wilcoxon Signed Rank Test, were conducted to systematically analyze the experimental data. Results of the statistical analyses proved that the developed system generated identical productivity measurements compared to the stopwatch method, which is considered the classic productivity measurement method. In addition, a procedure to improve the on-site construction using the WRITE System and benchmarking technique was developed. The WRITE System has a potential to strengthen communication and coordination among participants involved in the infrastructure construction process by providing more accurate productivity information in real time.

Maali, O M (2022) Management practices to improve adoption and employee well-being during organizational changes in the AEC industry, Unpublished PhD Thesis, , University of Kansas.

Mohamed, M (2022) A risk-based model for construction inspection in highways, Unpublished PhD Thesis, , University of Kansas.

Nguyen, P H D (2020) Development of fuzzy hybrid approaches to project delivery method selection in highway construction, Unpublished PhD Thesis, , University of Kansas.

Pasley, G P (1997) Steelteam: Creating a collaborative design environment for the steel building industry, Unpublished PhD Thesis, , University of Kansas.

Penland, J L (2002) Implementation of web-based team collaboration tools in the architectural, engineering and construction industry, Unpublished PhD Thesis, , University of Kansas.

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types, Unpublished PhD Thesis, , University of Kansas.